Packaging -
-
Shipping and storage
Packaging
-
-
Identificati
on
-
-
Storage
S22
-
-0
01EN05
4/6
02--2011
© ALSTOM 2010. All rights reserved. Informat
ion contained in
this document is indicative only. No
representati
on or
warrant
y is
given or should
be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liabili
ty and
is subject to
change without notice. Reproduction, use or disclosure to
third parties, without express writt
en authority, is
strictly prohibited.
GRID
Storage
2 years
Introduction
The
storage
proced
ures
defined
below
are
for
storage
times
of
less
than
2
yea
rs.
For
lon
ger
per
iod
s,
spe
cial
pac
kag
ing
must
be
des
ign
ed
and
app
rop
ri-
ate procedures devised.
Short-
-term
storage
(6 months)
The table below indicate how to stock the main components of the circuit---
breake
r for a
medium-
-term storage
:
C
o
m
p
o
n
e
n
t
S
t
o
r
a
g
e
Protective bag in good condition
(vacuum--wrapped)
The
ap
pa
rat
us
mus
t
be
sto
re
d
wi
th
its
tr
an
sp
or
t
pa
ck
ag
in
g
op
en
wh
il
st
pla
ced on bea
ms in a
clos
ed, but
ven
-
tilated, f
lood-
-proof
place.
Protective bag not vacuum---
wrapped (teared)
The
ap
pa
ra
tus
mus
t
be
sto
re
d
on
be
ams
in
a
clo
se
d,
bu
t
ve
nti
lat
ed
,
flood--proof place, placed on beams
in stable transport position, packing
open.
In order to prevent corro
sion
damage
du
e
to
for
ma
tio
n
of
co
nd
en
sa
tio
n,
it
is
mandatory that the heating circuit be
switche
d
on.
Medium-
-term
storage
(less than 2 years)
The apparatus must be stored on beams in a closed, but ventilated, flood---
proof place, placed on beams in stable transport position, packing open.
D
In order to
preven
t corrosion damag
e due to f
ormation of conden
sation, it
is mandatory that the heating circuit be switched on.
D
Che
ck
for
pr
es
en
ce
of
SF
6
ga
s
in
po
le
s
(re
ferto
mo
du
le
C
he
cki
ng
forpres
-
ence of SF
6
gas in poles”).
PROTECT THE ELECTRICAL CABINET AGAINST DUST. (THE ELEC-
TRICAL CABINET MUST BE COVERED BUT NOT AIRTIGHT).
ANY
CHA
NGE
OF
LOCA
TION
OF
THE
APP
ARA
TUS
(EV
EN
AFT
ER
COM-
MIS
SION
ING)
SHO
ULD BE
DON
E
A
T
A
RED
UCE
D
PRE
SSU
RE
OF
0.03
MPa
.