EasyManua.ls Logo

Alstom GL314 P - Page 155

Alstom GL314 P
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GRID
High Voltage Switchgear
PS 0002EN
03 1996-03-18 2011-03-21 3 / 3
Sheet N° Revision 1st issue Revision date Page
SAFETY INSTRUCTIONS
PACKING
TRANSPORT
INSTALLATION
START-UP
OPERATION
MAINTENANCE
SCRAPPING &
RECYCLING
Handling of insulating jackets at transport pressure (300
hPa maximum).
X X X
Ensure that cases have not been damaged during
handling or prolonged storage.
X
Follow the stacking instructions.
X X X
It is essential to open cases from the top and to take
care when unpacking.
X
Before handling any hydraulically operated
component, bring oil pressure back to atmospheric
pressure.
X X
Before handling any mechanically operated
component, disable the springs.
X X
Bring insulating jacket working pressure back to
transport pressure (300 hPa maximum).
X X

Related product manuals