EasyManua.ls Logo

Altech-Eco CNG - Cylinder Installation - 6.5 & 8 Long Bed

Default Icon
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2018 FORD F-150 5.0L COMPRESSED NATURAL GAS CONVERSION SYSTEM INSTALLATION INSTRUCTIONS
2018 F-150 5.0L INSTALLATION MANUAL
Page 9
1. Install grommet.
2. Remove the two or four Ford front bed bolts and discard.
3. With a hoist, lower the pre-assembled cylinder package in the bed of the truck. Be
careful not to damage the bed walls.
Secure with bolts provided.
Two or four M12 - 1.75” x 110mm bolts and 1/2” washers into the front cylinder
plate. These two or four bolts replace the two front OEM bolts.
Two or four 1/2”-13 x 2” bolts into the rear cylinder plate. Secure the rear plate
using the mounting backing plates underneath, combine with 1/2” washers and 1/2”
- 13 nylock nuts. Tighten each bolt to 70-75 ft-lbs of torque.
CYLINDER INSTALL - 6.5’ SHORT BED & 8’ LONG BED
6.5’ Bed 8’ Bed