INSTALLATION
Ve ct or F ® Se ries ▪ O pera to r’s Man ual ▪ MN-468 94 ▪ Rev 1 ▪ 7/2 0
21
Continued from previous page
Continued on next page
Electrical
Alto-Shaam oven ratings Breaker: Voltage: Phase:
The following fields must be completed by the service technician on site.
What is the measured voltage at the site? L1-N: L2-N: L3-N: L1-L2:
L2-3: L1-L3: Pass Fail
What is the on-site breaker size supplying
power to the oven(s)?
Size: Pass Fail
Is there a disconnect or junction box within
3’ (914mm) of where the oven(s) will be
installed?
Pass Fail
Comments:
Gas-F Series only
What is the gas type for the oven(s) to be installed? Natural Propane
What is the gas type confirmed at installation site? Natural Propane Pass Fail
Is there a minimum of one 3/4” gas supply line within 3’
(914mm) of where the oven(s) will be installed?
Pass Fail
On the gas line, is there a 3/4” NPT pipe connection with a shut-
off valve within 3’ (914mm) of where the oven(s) will be
installed?
Pass Fail
Comments:
Wifi equipped ovens
Is the Wifi system that be used secure, Wifi Protected Access 2 (WPA2)? The
Wifi system to be used cannot be Point of Sales Wifi.
Yes No
Have you been provided the Service Set Identifier (SSID) for the system to be
used?
Yes No
Have you been provided the pass phrase for the Wifi system to be used? Yes No
At the final location that the oven will be installed, can you connect to the Wifi
system with your phone?
Yes No
At the final location that the oven will be installed, can you connect to Alto-
Shaam.com with your phone using the Wifi system?
Yes No
Is site action required? Yes No
Action required: