EasyManua.ls Logo

AmazonBasics B079LNTDQV

AmazonBasics B079LNTDQV
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Prepare for cooking
Step 5: Safely close the lid
Before closing the lid, check if the sealing ring is well installed.
Hold the handle of the upper cover, align the “ ” on the edge of the upper cover with the “
mark on the edge of the housing cover, put the top cover horizontally on the cooker body, turn
the upper cover about 30° clockwise to the lock position, and align the “ ” mark on the edge
of the housing cover with the “ ” mark on the lid.
Step 6: Position the exhaust valve well
Sealing schematic diagram Exhaust schematic diagram
When working, please turn the exhaust valve to the sealing position, which means the electric
pressure cooker remains at a sealing state;
For manual exhaust, please turn the exhaust valve handle to the exhaust position, the electric
pressure cooker remains at an exhaust state; when exhausting, do not hold your hands or face
above the exhaust opening;
Check if the float valve drops down before working (before heating, the float valve is down).