Do you have a question about the Amazone D9 4000 Super and is the answer not in the manual?
Brand | Amazone |
---|---|
Model | D9 4000 Super |
Category | Farm Equipment |
Language | English |
Details the operator's and user's responsibilities and liabilities regarding safe operation.
Explains the meaning of DANGER, WARNING, CAUTION, IMPORTANT, and NOTE safety symbols.
Covers the provision of personal protective equipment and keeping the operation manual accessible.
Specifies the training requirements for personnel operating or maintaining the implement.
Details safety features and protective equipment like handrails and road safety bars.
Covers hydraulic and electronic regulation of the seed rate via gearbox adjustment.
Outlines the calibration test procedure to determine and set the correct seed rate.
Explains factors affecting seed placement depth and how to adjust coulter pressure.
Describes the function and adjustability of the exact following harrow for seed coverage.
Describes how tramlines are created for fertilising and plant care.
Ensures the tractor meets requirements for weight, axle loads, and braking power.
Provides methods for calculating tractor weights, axle loads, and required ballast.
Covers coupling and uncoupling hydraulic hose lines, including safety precautions.
Details the process and safety measures for coupling implements to the tractor.
Guides on selecting metering wheels, adjusting settings, and calibrating the seed rate.
Provides instructions and safety warnings for filling the seed box.
Outlines the procedure for performing a calibration test to set the seed rate.
Instructs on moving track markers between working and transport positions safely.
Details how to adjust coulter pressure and depth control discs for seed placement.
Details how to adjust the working width and tine position of the exact following harrow.
Provides a step-by-step guide for preparing the seed drill for transport.
Covers national traffic regulations, transport width, height, speed, and warning beacons.
Outlines checks and services required before and after initial commissioning.
Provides a step-by-step guide for moving the implement from transport to working position.
Provides instructions and safety warnings for emptying the seed box and housing.
Addresses reasons for seeding rate deviations and how to measure/recalibrate.
General safety warnings related to crushing, shearing, and unintentional movements.
Presents a schedule for daily, weekly, and periodic maintenance tasks.
Lists criteria for inspecting hydraulic hoses and when replacement is necessary.