EasyManua.ls Logo

Amco C700 User Manual

Default Icon
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
January 2003
______________________________________________________________________
______________________________________________________________________
1
AMCO Water Metering Systems For Potable Cold Water Meters
Installation/Start-up Instructions
INTRODUCTION
All AMCO water meters have been manufactured with current technology in
accordance with applicable AWWA standards. Water passes through a measuring
chamber driving an oscillating piston or rotor, the movements of which are transferred
by appropriate gearing and magnetic drive to a standard direct reading sealed register.
If the meter has been ordered with visual remote (RMR), electronic remote (EMR) or
InsideR™ transmitter, refer to the following documents for additional instructions:
1. Remote Meter Read (RMR) RMR-INS-022
2. Encoder Electronic Meter Read (EMR) EMR-INS-026
3. InsideR™ INS-INSIDE-RF
TESTING FOR METER ACCURACY
All AMCO water meters have been flow tested before shipment. Should further
accuracy tests be necessary, the requirements of Table 5-3 of the AWWA Manual M-6
should be followed. Before testing, thoroughly flush the meter to eliminate all air from
the test bench system. In the case of turbine and compound meters, water should
pass through as much straight pipe as possible before entering the meter, or install a
turbulence canceling strainer ahead of the meter. Turbines and compound meters
tested in series must have straight pipe between meters for absolute accuracy testing.
GENERAL INSTALLATION INSTRUCTIONS FOR ALL AMCO WATER METERS
(1) Install meters in a service line which has been flushed free of foreign
material.
(2) Install meters in horizontal or inclined pipe work.
(3) Install meters with the flow direction arrow pointing downstream, i.e. towards
the utility customer’s facility being served by the meter.
(4) Thoroughly tighten all meter couplings or companion flange bolts.
POSITIVE DISPLACEMENT AND TURBINE METER START-UP
A meter’s measuring device can be damaged if subjected to full flow conditions prior to
expelling all the air from the pipeline.
(5) With all valves closed, open a downstream faucet or other fixture that will
demand water from the water main.
Question and Answer IconNeed help?

Do you have a question about the Amco C700 and is the answer not in the manual?

Amco C700 Specifications

General IconGeneral
BrandAmco
ModelC700
CategoryMeasuring Instruments
LanguageEnglish

Summary

Introduction

Testing for Meter Accuracy

General Installation Instructions

Meter Start-Up Procedures

Positive Displacement and Turbine Meter Start-Up

Guidance for starting PD and turbine meters, avoiding damage from initial full flow.

Compound Meter Start-Up

Steps for starting compound meters, detailing bypass and main line turbine operation.

Fire Hydrant Meter Start-Up

Instructions for installing and starting fire hydrant meters safely.

Maximizing Meter Accuracy

Warnings and Cautions

Positive Displacement Meters

Details regarding non-return valves, plastic cases, and frost protection for PD meters.

Fire Hydrant Meters

Information on restrictor plates, check valves, and installation precautions for hydrant meters.

Performance Data