EasyManua.ls Logo

Ametek SEQUOIA Series - Page 105

Ametek SEQUOIA Series
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sequoia / Tahoe Series User Manual California Instruments
82 M447352-01 REV-A
12. Navigate to the CONFIGURATION MENU screen – SYNC SETTINGS screen and Enter the
measured value of each phase as the sync phase sequence value of the Sequoia. refer to the
below image.
13. Synchronize the Sequoia with the UUT output by pressing the Sync button from the front panel
dashboard screen, refer to the below image.
14. The sync button will be highlighted once the synchronization has happened or else an error
message will be displayed with the text “Sync Setting Error”.
15. If the error occurs, verify the programmed sync settings (voltage, frequency, and phase sequence)
are matching with the UUT output values.
16. Set the required Load parameters through the front panel dashboard screen and enable the output
of the Sequoia.
Steps to perform the DC mode Synchronization:
1. Connect UUT output to the output of the sequoia. Power up both units.
2. Set the Sequoia to the required range and enable the output of UUT.
3. Set the Sequoia to the required range and program the sync voltage as the output voltage of the
UUT, sync voltage tolerance can be +/- 10% of the set value.

Other manuals for Ametek SEQUOIA Series

Related product manuals