EasyManua.ls Logo

Ametek SEQUOIA Series - Page 301

Ametek SEQUOIA Series
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sequoia / Tahoe Series User Manual California Instruments
278 M447352-01 REV-A
9. Send the SCPI command, INST:NSEL 2, and repeat Step-4 through Step-8 to align Phase-B.
10. Send the SCPI command, INST:NSEL 3, and repeat Step-4 through Step-8 to align Phase-C.
9.2.12 Output Current Measurement AC High-Range Offset Alignment, AC-Mode
1. Ensure that there is no load connected to the output of the power source.
2. Enter the calibration password with the SCPI command, CAL:PASS “5000”.
3. Send the following SCPI command to select Phase-A:
INST:NSEL 1
4. Send the following SCPI commands to the power source (333 VAC range selected; ALC off):
OUTP 0
CURR:PROT OFF
MODE AC
VOLT:RANGE 333
VOLT 0
FREQ 100
VOLT:ALC OFF
OUTP 1
5. Reset the high-range offset alignment with the SCPI command, CAL:MEAS:CURR:HROF 0.
6. Measure the output current with the SCPI command, MEAS:CURR?.
7. Perform the alignment with the SCPI command, CAL:MEAS:CURR:HROF <numeric value>.
The numeric value is the output current returned by the command MEAS:CURR?. Enter
successive values from MEAS:CURR? until the alignment gives a value of 1 mA(RMS).
8. Send the SCPI query command, *OPC?, after each numeric value entry to determine when this
alignment has been completed. Ensure alignment has been completed (query returns a 1)
before continuing.
9. Send the SCPI command, INST:NSEL 2, and repeat Step-4 through Step-8 to align Phase-B.
10. Send the SCPI command, INST:NSEL 3, and repeat Step-4 through Step-8 to align Phase-C.
9.2.13 Output Current Measurement DC-Positive Low-Range Gain Alignment, DC-Mode
1. Connect the power analyzer for DC current measurement.
2. Connect the load to the output of the power supply.
3. Set load for the low-range resistance for 90% of the rated current, appropriate for the model that
is to be aligned. Ensure that the load setting maintains the power source in the constant-voltage
(CV) mode of operation.
4. Enter the calibration password with the SCPI command, CAL:PASS “5000”.
5. Send the following SCPI command to select Phase-A:
INST:NSEL 1
6. Send the following SCPI commands to the power source (250 VDC range selected; ALC off):
OUTP 0
CURR:PROT OFF

Other manuals for Ametek SEQUOIA Series

Related product manuals