III
.
STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of base-plate (See Fig. 6).
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit (See Fig. 7).
Fig. 7
2. Move the lift aside with fork lift or hoist, and open the outer packing carefully, take off
the parts from upper and inside the column, take out the parts box, check the parts
according to the shipment parts list(See Fig. 8)
Fig. 8