Ampcontrol Pty Ltd – ABN 28 000 915 542
GG2 COMMUNICATIONS USER MANUAL
GG2B032
Version 1 – JULY/2020
Uncontrolled Copy - Refer to Ampcontrol Website for Latest Version
APPROVED FOR EXTERNAL DISTRIBUTION
– PROPERTY OF AMPCONTROL PTY LTD
– NOT TO
BE REPRODUCED IN PART
5 MODBUS COMMUNICATIONS
5.1 GG2 Detector Removal
If Modbus is activated and the detector is removed, all bit fields will go to all zeros and all numerical
values will go to 0xFFFF. The setpoint flag bits will go high (1) and are exceptions to the previous rule.
5.2 Register Map
All values can be assumed to be the Modbus default endianness, big-endian. Any exceptions to this will
be noted in the Format column.
Safety Registers
SCADA* - These registers/bits must be monitored and included in the trip permissives for all safety
system applications when this protocol is selected.
Detector gas reading
permyriad - unaffected by
telemetry test
Permyriad of full scale,
see Error! Reference s
ource not found.Error!
Reference source not
found.
Bit-inverted Detector gas
reading permyriad -
unaffected by telemetry test
Permyriad of full scale,
See Error! Reference s
ource not found.Error!
Reference source not
found.
Signed Int, bit
inversion
Increments on each
cycle, nominally every
100ms.
Safety Word – system fault
Safety gas value invalid i.e.
reg 1
Operational Registers
SCADA* - These registers/bits must be monitored and included in the trip permissives for all safety
system applications when this protocol is selected.
Detector gas reading
permyriad - may be forced
by telemetry test.
Permyriad of full scale,
see Error! Reference s
ource not found.Error!
Reference source not
found.
Calibration due (every 6
months)
T90 test due (every 31
days)