Model
Document No. Version
Panel
Effective from Date Updated
NO
Amount
Diagram Tool Parameters
1 7B11-052586-20105111 1
Electric screwdriver
2
12±1kgfcm
3
4
5
Prepared by Reviewed by Approved by
Lin Liangjun
Unit Assembly 01
Operations and Requirements
Take down the 1PCS screw with an electric screwdriver.
When finished, step on the switch with your foot to send the product to
next station.
1. Wastes produced by this station shall be placed in the assigned position. Refer to Waste Classification and Disposal List .
Project Controlled Seal
Station Name
Base Disassembling
Part Number
Figure:
Recent
Modification
Record
Section/Serial No.
Descriptions
Take down the base and put it on specified place.
Notice
Φ5×25mm P-head black-zinc-plated machine screws
with spring washers
Figure 1
Please read and understand the
operating instructions carefully
1