EasyManua.ls Logo

Aquatic F2 Drain - User Manual

Default Icon
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
— 1 —
Customer Service (800) 945-2726 • www.aquaticbath.com
Installation Instructions
F
2
DRAIN
FOR USE WITH AQUATIC 2-PIECE FREESTANDING BATHTUBS
STEPS BEFORE FLOOR FINISH
Step 1:
A. With the help of the bathtub apron or
the optional template, mark the center
of the drainage line in relation with the
desired position of the bathtub.
B. Drill a hole (diameter between 4½''
and 6'') to the floor in the previously
marked position.
Step 2:
A. Insert the female side of the slip joint
until the shoulder of the mounting
flange and tighten the clamp.
B. Temporarily insert the slip joint's
male part inside the F² drain and
insert the prevention cap.
C. Use aligning guide points to position
the flange adjusted parallel to the
adjacent wall. Fasten the flange in
the floor.
D. Finish connecting to the plumbing
drain line under the floor. Paste as
recommended by the plumbing code.
Step 3:
A. Using the template or the bathtub skirt
trace the inside rim of the skirt. Use this
line as minimal limit for tile installation.
F² Drain video
Prevention
cap
PARTS INCLUDED
Drain adapter
(use if required)
Slip joint
(Female-female)
male
end
female
end
Clamp
Installation
flange
1A
Floor
Drain position
Desired bathtub position
Inside of the tub
Outside of the tub
Top view
Aligning guide points
2C
Prevention cap
Slip joint
(Male)
2B
Clamp
Slip joint
(Female)
Shoulder
Installation flange
2A
Top view
W1AX6032FTO, W1AX6636FTO, W2AX6032FTO, W3AX6042FTO,
W3AX6636FTO, W4AX6032FTO, W4AX6636FTO
Question and Answer IconNeed help?

Do you have a question about the Aquatic F2 Drain and is the answer not in the manual?

Summary

Steps Before Floor Finish

Mark and Drill Drain Hole

Mark the center for the drain line and drill a hole (4.5-6") in the floor at the desired bathtub position.

Install Slip Joint and Flange

Insert female slip joint, tighten clamp, install male part with prevention cap, align flange, and fasten to floor.

Tile Installation Guideline

Trace the bathtub skirt rim to establish the minimal limit for tile installation.

Finishing Steps

Install Waste and Overflow Assembly

With the bathtub bottom up, align the waste & overflow with apron's predrilled holes and secure.

Connect Drain Line and Level Legs

Connect male slip joint to drain line, position apron, level legs, and install faucet if applicable.

Secure Apron to Floor

Align apron pins with flange, screw apron to floor, and drill/fasten to ground. Apply silicone optionally.

Insert Bathtub and Water Connections

Add spacers, insert bathtub, connect water fittings, test for leaks, and ensure insulating strip.

Final Tub Seating and Leg Contact

Remove spacers, lean tub onto apron, and ensure all legs contact the ground for stability.

Aquatic F2 Drain Specifications

General IconGeneral
BrandAquatic
ModelF2 Drain
CategoryPlumbing Product
LanguageEnglish