4
INSTALLATION HARDWARE INCLUDED
Remote Control
(With 2 AAA Batteries)
Top Mounting Rail
(With foam)
Lock Frame
Accordion Panels
(With "left" & 'Right" marked
on the front face)
Window Sash Seal
(Foam)
3/8" Screws
1/2" Screws
3/4" Screws
Insulation for the Accordion
Panels
(Thin sponge for back-up using)
Sash Lock
(Two holes)
Insulation Strip
(Foam) (Only for E-Star models)
QTY.
1
1
2
2
1
1
4
3
4
1
2
TOOLS NEEDED
Phillips Head Screwdriver
Flat Head Screwdriver
Drill&3/16ʺ Drill Bit
Pencil
Tape Measure
Scissors or Knife
Level
NOTE: Save carton and these Installation Instructions for future reference. The carton is the best way to store unit during winter or when not in use.
I FEEL
ECO
FAN
<
<