CHECKS
Before making the water circuit connections, check that:
the system has been cleaned
there are no impurities in the circuit water
compatible components are used (do not connect copper and steel to each other)
the system has been hooked up via the water circuit
the water is never harder than 20°F or softer than 12°F, and that its pH is 6.6 to 8.5. If this is not the case, install water
treatment to prevent incrustations and corrosion in the system.
the water circuit pressure never exceeds 5 bar, otherwise install a pressure reducer at the system's intake
an anti-freeze kit is installed, if the system is being used in an area prone to freezing temperatures
the boiler expansion vessel is large enough to handle the water in the system
WATER PIPE FITTINGS
HYBRID MODULE
Connect the external unit to the hybrid module at point A shown in the figure.
Connect the system delivery to the F connection of the hybid module
Connect the system return to the B connection of the hybid module
Connect an anti-freeze kit (optional) in order to preserve the integrity of the external unit in the event of electric shock
due to any cause (e.G. Frost)
Insert a filter at the external unit input.
A
C
D
E
F
B
HYBRID MODULE
Filter
Valves kit (optional)
Flexible pipes kit (optional)
Anti-freeze kit
(optional)
A
.
Hot water delivery from external unit G 1” M
B
.
Cold water return to the external unit
C. Cold water inlet G ½” M
D. GAS inlet G ¾” M
E. Domestic hot water delivery G ½” M
F
.
Hot water delivery system G 1” M
Dirt separator filter
(not supplied)