Do you have a question about the Armstrong EHU-800 Series and is the answer not in the manual?
General introduction to the Series EHU-800 humidifier and its purpose.
Essential safety guidelines for handling high voltage and electrical components of the humidifier.
Details electrical specifications, circuit breaker needs, and disconnect switch requirements.
Detailed explanation of each item and its meaning on the humidifier's nameplate.
Lists the certifications and standards the humidifier meets.
Information regarding the materials used in the humidifier's construction.
Details the items included in the humidifier's delivery package.
Instructions for checking shipments and ensuring installation compliance with local codes.
Provides detailed measurements and weight specifications for various EHU models.
Lists all parts of the humidifier with their corresponding part numbers and model usage.
Guidelines for choosing an appropriate and safe location for humidifier installation.
Explains EHU operation, conductivity needs, and factors affecting it.
Describes automatic drain function and provides guidance for water conductivity issues.
Details problems with high conductivity and offers remedies.
Instructions for mounting the humidifier securely to a wall.
Details on connecting water supply and drain lines, including safety warnings.
Guidance on installing the steam dispersion tube for optimal vapor mixing.
Information on connecting the unit to the electrical service and fuse requirements.
Wiring diagram for the EHU-801 single-phase model.
Wiring diagram for the EHU-801 three-phase model.
Wiring diagram for the EHU-803 single-phase model.
Wiring diagram for the EHU-803 three-phase model.
Wiring diagram for the EHU-804 single-phase model.
Wiring diagram for the EHU-804 three-phase model.
Important safety and wiring guidelines before connecting control signals.
Instructions for setting dipswitches based on the control signal type (VDC, mA).
Wiring diagrams for connecting humidistats, pressure, and high limit switches.
Wiring for sensors, BMS, and room-mounted modulating humidistats.
Tables detailing output capacities (lbs/hr, kg/hr) for single-phase models.
Tables detailing output capacities (lbs/hr, kg/hr) for three-phase models.
Guidance on selecting appropriate wire size and circuit breakers for different amp ratings.
Schemes for modifying remote contacts (NO/NF) for various functions.
Description of dry contacts for steam production, general fault, and maintenance.
Guidelines for optimal placement and conditions for wall-mounted humidistats.
Recommendations for installing duct-mounted high limit humidistats.
Explains the role of an airflow switch in deactivating the humidifier during low airflow.
Overview of the main display screens showing humidifier status and operational data.
Step-by-step guide to changing humidifier configuration settings via the keypad.
Details on navigating menus for steam capacity, maintenance intervals, and drain settings.
Indicates when initial inspection and checks are required after 50 hours of operation.
Alerts for maintenance intervals and critical overdue states, including system shutdown.
Notifies the user after 10,000 hours of run time, recommending contactor replacement.
Identifies and troubleshoots contactor engagement issues (failure or blocked).
Detects water leaking into the tank, requiring checks of fill and drain valves.
Troubleshoots issues with no water detection and drain system faults.
Addresses high tank electrode current, indicating a need for drain valve operation and cleaning.
Details wiring for RS-485 connection for Modbus communication.
Guide to setting control signal, EHU identification, and baud rate for Modbus.
Table mapping Modbus registers to humidifier parameters and data classes.
Explains how to interpret stat demand and current readings for normal operation.
Describes the function of automatic and manual drain modes for conductivity control.
Periodic checks for leaks, arcing, and hose integrity, plus safety actions for arcing.
Specific checks for drain valve function and fuse status during arcing events.
Identifies key parts of the steam generator requiring maintenance or replacement.
When cleaning is needed based on service time, buildup, or maintenance messages.
Step-by-step guide for chemically cleaning the steam generator, including safety.
When to replace the tank, and causes of electrode wear like conductivity and voltage.
Step-by-step guide for safely removing, cleaning, and replacing tank/electrodes.
Detailed steps for disassembling tank halves for different EHU models.
Steps to diagnose and fix issues with the drain valve operation.
Steps to diagnose and fix issues with the fill valve operation and water pressure.
Confirms model, capacity, mounting, and steam dispersion piping setup.
Verifies inlet water pressure, drain lines, wiring, and control signal installation.
Ensures checklist completion and verifies initial electrical and water connections.
Steps for powering on, observing display, and verifying demand signal and valve operation.
Information on PCB index and control wiring precautions for legacy models.
Identifies connectors and fuses on the main control board for EHU-800.
Outlines the warranty period, exclusions, and limitations of liability.
Specifies the warranty duration for EHU-800 and related humidifiers.
Detailed explanation of how the EHU-800 converts water to steam using electrodes.
General introduction to the Series EHU-800 humidifier and its purpose.
Essential safety guidelines for handling high voltage and electrical components of the humidifier.
Details electrical specifications, circuit breaker needs, and disconnect switch requirements.
Detailed explanation of each item and its meaning on the humidifier's nameplate.
Lists the certifications and standards the humidifier meets.
Information regarding the materials used in the humidifier's construction.
Details the items included in the humidifier's delivery package.
Instructions for checking shipments and ensuring installation compliance with local codes.
Provides detailed measurements and weight specifications for various EHU models.
Lists all parts of the humidifier with their corresponding part numbers and model usage.
Guidelines for choosing an appropriate and safe location for humidifier installation.
Explains EHU operation, conductivity needs, and factors affecting it.
Describes automatic drain function and provides guidance for water conductivity issues.
Details problems with high conductivity and offers remedies.
Instructions for mounting the humidifier securely to a wall.
Details on connecting water supply and drain lines, including safety warnings.
Guidance on installing the steam dispersion tube for optimal vapor mixing.
Information on connecting the unit to the electrical service and fuse requirements.
Wiring diagram for the EHU-801 single-phase model.
Wiring diagram for the EHU-801 three-phase model.
Wiring diagram for the EHU-803 single-phase model.
Wiring diagram for the EHU-803 three-phase model.
Wiring diagram for the EHU-804 single-phase model.
Wiring diagram for the EHU-804 three-phase model.
Important safety and wiring guidelines before connecting control signals.
Instructions for setting dipswitches based on the control signal type (VDC, mA).
Wiring diagrams for connecting humidistats, pressure, and high limit switches.
Wiring for sensors, BMS, and room-mounted modulating humidistats.
Tables detailing output capacities (lbs/hr, kg/hr) for single-phase models.
Tables detailing output capacities (lbs/hr, kg/hr) for three-phase models.
Guidance on selecting appropriate wire size and circuit breakers for different amp ratings.
Schemes for modifying remote contacts (NO/NF) for various functions.
Description of dry contacts for steam production, general fault, and maintenance.
Guidelines for optimal placement and conditions for wall-mounted humidistats.
Recommendations for installing duct-mounted high limit humidistats.
Explains the role of an airflow switch in deactivating the humidifier during low airflow.
Overview of the main display screens showing humidifier status and operational data.
Step-by-step guide to changing humidifier configuration settings via the keypad.
Details on navigating menus for steam capacity, maintenance intervals, and drain settings.
Indicates when initial inspection and checks are required after 50 hours of operation.
Alerts for maintenance intervals and critical overdue states, including system shutdown.
Notifies the user after 10,000 hours of run time, recommending contactor replacement.
Identifies and troubleshoots contactor engagement issues (failure or blocked).
Detects water leaking into the tank, requiring checks of fill and drain valves.
Troubleshoots issues with no water detection and drain system faults.
Addresses high tank electrode current, indicating a need for drain valve operation and cleaning.
Details wiring for RS-485 connection for Modbus communication.
Guide to setting control signal, EHU identification, and baud rate for Modbus.
Table mapping Modbus registers to humidifier parameters and data classes.
Explains how to interpret stat demand and current readings for normal operation.
Describes the function of automatic and manual drain modes for conductivity control.
Periodic checks for leaks, arcing, and hose integrity, plus safety actions for arcing.
Specific checks for drain valve function and fuse status during arcing events.
Identifies key parts of the steam generator requiring maintenance or replacement.
When cleaning is needed based on service time, buildup, or maintenance messages.
Step-by-step guide for chemically cleaning the steam generator, including safety.
When to replace the tank, and causes of electrode wear like conductivity and voltage.
Step-by-step guide for safely removing, cleaning, and replacing tank/electrodes.
Detailed steps for disassembling tank halves for different EHU models.
Steps to diagnose and fix issues with the drain valve operation.
Steps to diagnose and fix issues with the fill valve operation and water pressure.
Confirms model, capacity, mounting, and steam dispersion piping setup.
Verifies inlet water pressure, drain lines, wiring, and control signal installation.
Ensures checklist completion and verifies initial electrical and water connections.
Steps for powering on, observing display, and verifying demand signal and valve operation.
Information on PCB index and control wiring precautions for legacy models.
Identifies connectors and fuses on the main control board for EHU-800.
Outlines the warranty period, exclusions, and limitations of liability.
Specifies the warranty duration for EHU-800 and related humidifiers.
Detailed explanation of how the EHU-800 converts water to steam using electrodes.
| Type | Electric Steam Humidifier |
|---|---|
| Inlet Water Connection | 1/2" NPT |
| Capacity | 800 lbs/hr (363 kg/hr) |
| Phase | 3-phase |
| Frequency | 60 Hz |
| Voltage | 480V, 600V |
| Maximum Current | Varies by model and configuration |