EasyManua.ls Logo

Arozzi Arena - Step 2 & 4: Assembling the Frame; Step 7 & 8: Installing Cable Management Net

Arozzi Arena
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Insert tighten the four screws, repeat the procedure for the other leg.
STEP 4
4. Place the parts you just assembled on the legs as shown below. Screw them together loosely with
package C Repeat procedure for the other side.
Now the frame is done, DO NOT tightens the screws yet.
STEP 7
7. The screws in the last remaining package, E will hold the cable management net in place. Put them
in the remaining holes as shown. Now tighten all the screws from previous steps
STEP 8
8. Put the net on by placing the loops over bolt heafs.
READ MORE AT AROZZI.SE / AROZZI.COM
ARENA ASSEMBLY GUIDE