EasyManua.ls Logo

ASBER AESB-24 - Installation and Assembly; Uncrating; Installation

ASBER AESB-24
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3asberprofessional.com
asberprofessional.com
2.3 Installation and assembly
SHIPPING DAMAGE CLAIM PROCEDURE
The equipment is inspected and crated by skilled personnel before leaving our factory. The
transportation company assumes full responsibility for safe delivery upon acceptance of this equipment.
If shipment arrives damaged:
Visible loss or damage: Note on freight bill or express delivery and signed by person making
delivery.
File claim for damages immediately: Regardless of extent of damages.
Concealed loss or damage: If damage is noticed after unpacking, notify Transportation
Company immediately and file Concealed Damage claim with them. This should be done
within (15) days from date of delivery made to you. Retain container for inspection.
2.3.1 UNCRATING
Cut and remove the outer packaging. Cut the (4) clamps that hold the equipment to the skid lift the unit
off the skid.
2.3.2 INSTALLATION
WALL MOUNTING:
1. Drill walll and place stoppers on holes, agree with the next sketch. (Specifications in
millimeters).
2. Place the support in the wall with the screws.
3. Hang the equipment.

Other manuals for ASBER AESB-24

Related product manuals