EasyManua.ls Logo

Asco 8000 SERIES - User Manual

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
8000 SERIES Load Banks
User Manual
Power
Technologies

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Asco 8000 SERIES and is the answer not in the manual?

Summary

Chapter One - Introducing Froment Load Banks

An Important Note on Safety

General safety warnings and precautions for operating load banks.

Introducing Froment 8000 SERIES Load Banks

Provides an overview of the 8000 Series containerised load banks.

8000 SERIES Load Bank Specifications

Lists technical specifications for 8300 and 8400 models.

Chapter Two - Load Bank Installation and Setup

Important Safety Instructions

General safety instructions for installation and operation.

Using a Froment Load Bank Safely

Covers hazards, safety precautions, and protective measures.

Installing Froment Load Banks

Factors to consider for safe and correct load bank placement.

Location Considerations

Guidance on selecting a safe and suitable installation site.

Avoiding Hot Air Re-circulation

Crucial for safe operation and preventing equipment damage.

Electrical Installation Requirements

Outlines the necessary electrical connection procedures.

Connecting the Supply-on-Test

Instructions for connecting the main power supply to the load bank.

Protective Earth Connection

Details essential grounding requirements for electrical safety.

Commissioning Procedure

A three-stage procedure to verify load bank operation.

Visual Inspection and Safety Check

Initial inspections and safety checks before operation.

Chapter Three - Load Bank Operation

Before Operating the Load Bank

Prerequisites that must be met before starting load bank operation.

Safety Warning During Operation

Reiterates critical safety advice for operating the load bank.

Main Control Panel Functions

Details switches, buttons, and indicators on the main control panel.

Fault Indicator Explanations

How faults are indicated and classified by the system.

Emergency Shutdown Procedures

Methods for performing an immediate shutdown in emergencies.

Load Function Test Procedure

Performing a brief load test after installation to confirm operation.

Chapter Four - Hand-held Reference Guide

SIGMA Hand-held Reference Guide

Introduction to the SIGMA Hand-held controller.

Using the Settings Pages

Setting up the handheld for correct operation.

Settings 1 - Supply-on-Test Configuration

Configuring Supply-on-Test parameters.

Setting the Supply-on-Test Rating Values

Details on checking and setting supply ratings.

Checking the Rating Values

Verifying generator ratings against handheld settings.

Test 1 - AVR and Governor Adjustment Setup

Initial setup for generator AVR and governor adjustments.

Assessing Supply Performance

Evaluating generator performance against ISO8528 standards.

Setting Load Values

Adjusting load parameters like kVA, kW, and power factor.

Automatic Test Mode

Setting up and running programmed test sequences.

Editing the Automatic Test Sequence

Customizing test stages, load, power factor, and duration.

Chapter Five - Maintenance & Troubleshooting

Safety Warning for Maintenance

General safety precautions to be taken during maintenance.

Routine Maintenance Procedures

Tasks for keeping the load bank in good working order.

Annual Maintenance and Calibration

Annual maintenance and load bank instrumentation calibration checks.

Fault Finding Guide

Troubleshooting common faults encountered with the load bank.

Load Bank Errors

Lists error codes and their possible causes and actions.

Summary

Chapter One - Introducing Froment Load Banks

An Important Note on Safety

General safety warnings and precautions for operating load banks.

Introducing Froment 8000 SERIES Load Banks

Provides an overview of the 8000 Series containerised load banks.

8000 SERIES Load Bank Specifications

Lists technical specifications for 8300 and 8400 models.

Chapter Two - Load Bank Installation and Setup

Important Safety Instructions

General safety instructions for installation and operation.

Using a Froment Load Bank Safely

Covers hazards, safety precautions, and protective measures.

Installing Froment Load Banks

Factors to consider for safe and correct load bank placement.

Location Considerations

Guidance on selecting a safe and suitable installation site.

Avoiding Hot Air Re-circulation

Crucial for safe operation and preventing equipment damage.

Electrical Installation Requirements

Outlines the necessary electrical connection procedures.

Connecting the Supply-on-Test

Instructions for connecting the main power supply to the load bank.

Protective Earth Connection

Details essential grounding requirements for electrical safety.

Commissioning Procedure

A three-stage procedure to verify load bank operation.

Visual Inspection and Safety Check

Initial inspections and safety checks before operation.

Chapter Three - Load Bank Operation

Before Operating the Load Bank

Prerequisites that must be met before starting load bank operation.

Safety Warning During Operation

Reiterates critical safety advice for operating the load bank.

Main Control Panel Functions

Details switches, buttons, and indicators on the main control panel.

Fault Indicator Explanations

How faults are indicated and classified by the system.

Emergency Shutdown Procedures

Methods for performing an immediate shutdown in emergencies.

Load Function Test Procedure

Performing a brief load test after installation to confirm operation.

Chapter Four - Hand-held Reference Guide

SIGMA Hand-held Reference Guide

Introduction to the SIGMA Hand-held controller.

Using the Settings Pages

Setting up the handheld for correct operation.

Settings 1 - Supply-on-Test Configuration

Configuring Supply-on-Test parameters.

Setting the Supply-on-Test Rating Values

Details on checking and setting supply ratings.

Checking the Rating Values

Verifying generator ratings against handheld settings.

Test 1 - AVR and Governor Adjustment Setup

Initial setup for generator AVR and governor adjustments.

Assessing Supply Performance

Evaluating generator performance against ISO8528 standards.

Setting Load Values

Adjusting load parameters like kVA, kW, and power factor.

Automatic Test Mode

Setting up and running programmed test sequences.

Editing the Automatic Test Sequence

Customizing test stages, load, power factor, and duration.

Chapter Five - Maintenance & Troubleshooting

Safety Warning for Maintenance

General safety precautions to be taken during maintenance.

Routine Maintenance Procedures

Tasks for keeping the load bank in good working order.

Annual Maintenance and Calibration

Annual maintenance and load bank instrumentation calibration checks.

Fault Finding Guide

Troubleshooting common faults encountered with the load bank.

Load Bank Errors

Lists error codes and their possible causes and actions.

Asco 8000 SERIES Specifications

General IconGeneral
BrandAsco
Model8000 SERIES
CategoryPortable Generator
LanguageEnglish

Related product manuals