3.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment and materials as bellow:
1) Working table
2) Screw-driver
3) Glove
4) Cleaning cloth
5) ESD protection
After unplugging the power cord, the power board still have power energe. Please pay
attention when disassembling/assembling.
No.
Picture
Operation
Tool
Note
1
1. Insert LVDS
Cable/Power BD
wire to Power BD
and Main Board.
2. Assemble Main
Board and Power
BD to Shielding
then lock 7 screws
on Shielding.
Screw:
(#SCRW PH INT/TOO
M3*9TP-S C-ZN)
3. Assemble Mylar to
Shielding.
Screw
Driver
Torque :
5.0±0.5
Kg-cm
Power
Board
Main
Board
Main Board
Power
Board
Main Board