EasyManua.ls Logo

Asus BE24ECSBT - Disassembly and Assembly Procedures; Disassembly SOP

Asus BE24ECSBT
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Disassembly and Assembly Procedures
3.1 Disassembly SOP
Preparation before disassemble
1. Clean the room for disassemble
2. Identify the area for monitor
3. Check the position that the monitors be placed and the quantity of the monitor;
prepare the area for material flow; according to the actual condition plan the
disassemble layout
4. Prepare the implement, equipment and materials as bellow:
1) Working table
2) Screw-driver
3) Teardown lever *1
4) Glove
5) Cleaning cloth
6) ESD protection
After unplugging the power cord, the power board still have power energe. Please pay
attention when disassembling/assembling.
Item
Picture
Operation
Tool
Notes
1
1. Remove Stand.
2. Unlock 4 screws from
Rear Case.
Screw P/N:
(#SCRW
FPHM4*10L(7.7/1.6)B-
ZNNY)
3. Disassemble Rear Case
from monitor.
Screw
driver
Torque :
8~10
Kg-cm

Related product manuals