EasyManua.ls Logo

Asus PG35VQ - Disassembly and Assembly Procedures; Disassembly SOP

Asus PG35VQ
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
3. Disassembly and Assembly Procedures
3.1 Disassembly SOP
Preparation before disassemble
1. Clean the room for disassemble
2. Identify the area for monitor
3. Check the position that the monitors be placed and the quantity of the
monitor; prepare the area for material flow; according to the actual
condition plan the disassemble layout
4. Prepare the implement, equipment and materials as bellow:
1) Working table
2) Screw-driver
3) Teardown lever *1
4) Glove
5) Cleaning cloth
6) ESD protection
After unplugging the power cord, the power Board still have power energe. Please
pay attention when disassembling/assembling.
Item
Picture
Operation
Tool
Notes
1
1 Disassemble 2 Cover
from Rear Case.
2. Unlock 4 screws on
Rear Case.
Screw
driver

Related product manuals