EasyManua.ls Logo

Atec T3 - User Manual

Default Icon
2 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
. PROFESSIONAL BATTING TEE
GENERAL CARE
+ To clean, wipe stem with mild detergent soap mixed with water, use
clean towel to dry.
+ Do not add additional lubricant to tee stem pieces.
+ Do not over tighten T Screw, a snug fit is sufficient
+ When not in use, store in cool, dry environment.
+ If needed, a 10 pound (lbs) weight can be placed on the tee base to
increase stabilization during use.
Your T3 comes with a 1-year Limited Warranty.
Under normal use and care ATEC guarantees, to the original owner, the T3
to be free from defects in materials and workmanship.
During this period ATEC will repair or replace with new or refurbished
components, at ATEC’s sole discretion, any component found to be
defective without cost to the owner, provided the defective product is
returned to the factory at the owners expense. Proof of purchase may be
required by ATEC to approve certain warranty claims.
WARRANTY
ATEC Customer Service
(p) 1.800.755.5100
(e) askatec@atecsports.com
QUESTIONS?
A - Cone
B - Shrink Tube
C - Stem Top Tier - Composite
D - O Ring
E - Stem Middle Tier - Aluminum
F - Stem Bottom Tier - Aluminum
G - Base
H - Stem Receptacle
I - Expansion Plug
J - T Screw
FRAME
PARTS
T3
I
J
A
C
E
B
D
F
HG
BASE VIEW
UNDER BASE VIEW
ASSEMBLED VIEW
MODEL: WTATT3000
Question and Answer IconNeed help?

Do you have a question about the Atec T3 and is the answer not in the manual?

Summary

Parts and Components

General Care and Maintenance

Warranty Information

Customer Support

Quick Start: Setup and Takedown

Setup Procedure

Instructions for assembling the batting tee, including stem and base connection.

Step 1: Place Stem

Place the Stem (F) completely over the Expansion Plug (I) on the Base (G).

Step 2: Secure Stem

Secure stem to base by turning T-Screw (J) clockwise four times.

Takedown Procedure

Instructions for disassembling the batting tee, focusing on stem removal.

Step 3: Loosen Stem

Loosen stem by turning T-Screw (J) counter-clockwise four rotations.

Step 4: Separate Stem

Lift stem from base after loosening T-Screw.

Overview

The ATEC T3 Professional Batting Tee, model WTATT3000, is a robust and user-friendly training aid designed to help baseball and softball players improve their hitting skills. This device is engineered for durability and ease of use, making it suitable for both individual practice and team training sessions.

Function Description:

The primary function of the ATEC T3 is to provide a stable and adjustable platform for a baseball or softball, allowing players to practice their swing mechanics without the need for a pitcher. It simulates the position of a pitched ball, enabling repetitive drills to refine hand-eye coordination, bat path, and overall hitting technique. The tee's design focuses on stability and adjustability to accommodate various player heights and ball positions.

Important Technical Specifications:

The ATEC T3 batting tee is constructed from a combination of durable materials to ensure longevity and performance. Key components include:

  • Frame: The tee's structure is composed of several interconnected parts.
    • A - Cone: This is the top-most part where the ball rests. It is designed to securely hold the ball while minimizing interference with the bat during contact.
    • B - Shrink Tube: This component likely provides a protective or reinforcing layer for parts of the stem.
    • C - Stem Top Tier - Composite: The upper section of the adjustable stem, made from a composite material for a balance of strength and flexibility.
    • D - O Ring: A sealing or cushioning component, likely used in the adjustable stem mechanism.
    • E - Stem Middle Tier - Aluminum: The middle section of the stem, constructed from aluminum for lightweight strength.
    • F - Stem Bottom Tier - Aluminum: The lower section of the stem, also made from aluminum, connecting to the base.
    • G - Base: The wide, flat foundation of the tee, designed to provide stability and prevent tipping during use.
    • H - Stem Receptacle: The opening in the base where the stem is inserted and secured.
    • I - Expansion Plug: A component used within the stem-to-base connection to ensure a snug fit.
    • J - T-Screw: A large, easy-to-grip screw used to secure the stem to the base, allowing for quick assembly and disassembly.

The tee comes with a 1-year Limited Warranty, covering defects in materials and workmanship under normal use and care. ATEC guarantees to repair or replace defective components at its sole discretion, provided the product is returned to the factory at the owner's expense, and proof of purchase may be required.

Usage Features:

The ATEC T3 is designed for quick and straightforward setup and takedown, enhancing its practicality for frequent use.

Setup Process:

  1. Step 1: Place the Stem (F) completely over the Expansion Plug (I) located on the Base (G). This ensures the stem is correctly seated in the base.
  2. Step 2: While holding the stem over the expansion plug, turn the T-Screw (J) clockwise four full rotations. This action secures the stem firmly to the base, preventing wobbling during practice.

Takedown Process:

  1. Step 3: Turn the T-Screw counter-clockwise four full rotations to loosen the stem. It is crucial not to completely remove or unscrew the T-Screw, as this is unnecessary and could potentially misplace the screw.
  2. Step 4: Stand on the Base (G) and lift up on the Stem to separate the Stem from the Base. This leverage helps in detaching the stem easily after loosening the T-Screw.

General Usage Tips:

  • Stabilization: If additional stability is required, a 10-pound (lbs) weight can be placed on the tee base (G) during use. This is particularly useful in windy conditions or for powerful hitters.
  • Adjustability: The multi-tiered stem (C, E, F) allows for height adjustments, accommodating players of different heights and enabling practice at various ball positions (e.g., high pitches, low pitches). The O-ring (D) likely plays a role in the smooth adjustment or stability of these tiers.

Maintenance Features:

Proper care and maintenance are essential to extend the lifespan of the ATEC T3 batting tee.

Cleaning:

  • To clean the stem, wipe it with a mild detergent soap mixed with water.
  • Use a clean towel to dry the stem thoroughly after cleaning.

Important Care Instructions:

  • Lubrication: Do not add additional lubricant to the tee stem pieces. The design is intended to function without external lubricants, and adding them could potentially attract dirt or interfere with the components.
  • T-Screw Tightening: Do not overtighten the T-Screw (J). A snug fit is sufficient to secure the stem to the base. Overtightening can strip threads or damage components.
  • Storage: When not in use, store the batting tee in a cool, dry environment. This protects the materials from extreme temperatures and moisture, which can cause degradation over time.

For any questions or warranty claims, ATEC Customer Service can be reached at (p) 1.800.755.5100 or (e) askatec@atecsports.com. The product is proudly designed and built in Sparks, Nevada.

Atec T3 Specifications

General IconGeneral
BrandAtec
ModelT3
CategorySports & Outdoors
LanguageEnglish

Related product manuals