Instruction Book
9829 2115 69 40
Overview
Example for service level (A):
The figures at the left are the programmed service intervals. For Service interval A, the
programmed number of running hours is 4000 hours (upper row, green) and the
programmed number of real time hours is 4380 hours, which corresponds to six months
(second row, blue).
This means that the controller will launch a service warning when either 4000 running hours or
4380 real hours are reached, whichever comes first. Note that the real time hours counter
keeps counting when the controller is not powered.
The figures within the bars are the number of hours to go until the next service intervention.
In the example above, the dryer was just started, which means it still has 4000 running hours
or 4337 hours to go before the next Service intervention.
Service plans
A number of service operations are grouped (called Level A, Level B, etc...). Each level
represents a number of service actions to be carried out at the time intervals programmed in
the Elektronikon controller.
When a service plan interval is reached, a message will appear on the screen.
After carrying out the service actions related to the indicated levels, the timers must be
reset.
(1) Overview
(2) Running Hours (green)
(3) Real Time hours (blue)