EasyManua.ls Logo

Atlas Copco XAS 98 Kd WUX

Atlas Copco XAS 98 Kd WUX
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 29 -
PREVENTIVE MAINTENANCE SCHEDULE FOR THE COMPRESSOR
Maintenance schedule (running hours) 50 hours after
initial start-up
Every 250
hours
Every 500
hours
Every 750
hours
Every 1000
hours
Yearly 2 Yearly
Service parts
2912 5001 02 2912 5001 03 2912 5001 04
Change engine oil (2) x x x x x x x
Replace engine oil filter (2) x x x x x x x
Check for leaks in engine, compressor, air, oil, or fuel system x x x x x
Check torque on critical bolt connections x x x x x
Hoses and clamps-Inspect/Replace x x x x x
Inspect/Adjust fan belt x x x x x x
Check valve in the fuel return (for mechanical injection system) x x x x x x
Clean after cooler (option)(1) x x x x x x
Drain/Clean fuel tank water and sediments (1) x x x x x x
Replace fuel filter (5) x x x x x x
Replace fuel pre filter (5) x x x x x x
Clean oil cooler(s)/radiator x x x x x x
Inspection by Atlas Copco service technician x x x x x x
Check engine & compressor anti-vibration pads x x x x
Check functioning of regulating valve x x x x
Check electrical system cables for wear x x x x
Check engine (minimum and maximum) speed x x x x
Clean flow restrictor in oil scavenge line x x x x
Grease hinges x x x x
Check/Test glow plugs-grid heater x x x x
Replace bleed-off valve unloader x x x x
Check rubber flexibles (9) x x x x
Analyse coolant (3)(7) x x x x
Replace fan belt x x

Related product manuals