Do you have a question about the Atmos DC 25 S and is the answer not in the manual?
Steps for preparing the boiler before initial and regular use.
Required clearances around the boiler for fire safety compliance.
Steps for preparing the boiler before initial and regular use.
Required clearances around the boiler for fire safety compliance.
| Fuel | Wood |
|---|---|
| Power | 25 kW |
| Water Volume | 65 L |
| Flue Diameter | 150 mm |
| Max. Log Length | 530 mm |
| Fuel Type | Wood logs |
| Hopper Capacity | Not applicable |
Loading...