WASTEWATER TREATMENT

WASTEWATER TREATMENT
PLANT TECHNICAL PASS
AT SYSTEM
SOLUTIONS FOR HUMAN AND NATURE
example
Question and Answer IconNeed help?

Do you have a question about the August AT-6 and is the answer not in the manual?

Summary

Introduction to the Unit

Unit Installation Rules

Installation Location Selection

Select location for the unit ensuring treated water can flow automatically and is accessible for inspections.

Construction Preparation

Lay wastewater pipe with suitable slope, ensure proper burial depth, and match pipe diameters to unit couplings.

Unit Construction Procedures

Carry out earthwork according to regulations, excavate pits, ensure proper levelling on a reinforced concrete base.

Blower and Air Supply Pipe Installation

Select a ventilated location for the blower, connect electric cable, ensure distance to unit does not exceed 5m.

AUGUST BASIC Controller Installation

Install controller indoors or in blower container, ensure good air circulation, and lay appropriate electric cables.

Warranty Terms and Conditions

Manufacturers Quality Warranty Period

The underground part of the unit housing has a 10-year quality warranty from the date of sale or transfer.

Manufacturers Rectification Obligation

Manufacturer will rectify defects attributable to them and perform start-up/tuning within a reasonable period.

Warranty Coverage Scope

Warranty covers defects in underground housing due to material quality or design shortcomings notified during the term.

Warranty Validity Conditions

Warranty is valid if unit is stored/transported correctly, operated per manual, installed by authorized personnel, and paid for.

Warranty Service Eligibility Requirements

Operator must notify seller of defect within 10 days and submit purchase and installation documents.

Unit Diagram and Technical Data

Technical Parameters Table

Table listing diameter, height, inlet/outlet pipe dimensions, and average electrical consumption for different unit models.

Treatment Process Overview

Mechanical and Electrical Devices

Components of the treatment process including solids bag, air distribution, blower, and airlifts.

Solids Bag Functionality

Describes the solids bag for separating gross solids from wastewater and handling non-degradable materials.

Air Distribution Panel and Valves

Explains the air distribution manifold with valves for adjusting air supply to airlifts and aeration elements.

Flow Controller, Blower, Diffuser, and Airlifts

Details operations of the flow controller, blower, diffuser, and airlifts, including specific valve settings.

AUGUST BASIC Controller Operation

Initial Setup and Navigation

Guide for first run, language selection, setting date/time, and menu navigation using buttons.

Program Selection and Modes

Explains standard and non-standard programs (Holiday, Weekend House) and how to change them.

Other Settings and Information

Details options like date/time setup, operating hours, log reading, service menu, language select, and device status.

GSM Module Functionality

Describes the GSM module for network sign-up, connection to service center, and automatic settings.

Operation and Maintenance Instructions

Launching and Unit Shutdown

Steps for launching the unit, connecting components, and proper procedures for unit shutdown and cleaning.

Routine Maintenance Tasks

Lists necessary periodic inspection and maintenance tasks for the unit, including frequency.

Important Control Points

Key operational checks for solids bag, airlifts, aeration, and sludge pumping.

Controller Error Messages and Alarms

Explains optical alarm types (constant/flashing green/red) and their meanings, including power failure.

Maintenance Schedule and Procedures

Inspection and Service Intervals

Details maintenance modes like sludge concentration check, sludge removal, and filter replacement with intervals.

Controller Maintenance Notifications

Explains warnings like 'REPLACE FILTER' and 'CHANGE MEMBRANE' and how to confirm them.

Removal of Excess Sludge

Procedure for measuring settled sludge content and removing excess sludge to maintain optimal treatment efficiency.

Unit Maintenance Manual Recording

Excess Sludge Removal Process

Step-by-step guide for removing excess sludge, including blower shutdown and water level management.

Maintenance Manual Documentation

Importance of recording all defects, maintenance, and service visits in the manual for claims.

Safety and Protective Measures

General Security Precautions

Guidelines for safe servicing, electrical work, tool usage, hygiene, and access restrictions.

Personal Protective Equipment

Mandatory personal and protective equipment to be used during maintenance and operation.

Recommended Tools for Maintenance

List of specific tools recommended for unit maintenance, such as test flasks and brushes.

Certificate of Performance

Performance Test Results

Details of test report by PIA GmbH showing efficiency results for COD, BOD5, SS, NH4-N, Ntot, and Ptot.

EC Declaration of Performance

Product Identification and Intended Use

Unique code for domestic wastewater treatment plants and their intended use for treating wastewater.

Manufacturer and Harmonised Standard

Information on the manufacturer, authorized representative, and the harmonised standard EN 12566-3.

Declared Performances and Characteristics

Table of declared performances including efficiency, capacity, watertightness, and material properties.

Summary

Introduction to the Unit

Unit Installation Rules

Installation Location Selection

Select location for the unit ensuring treated water can flow automatically and is accessible for inspections.

Construction Preparation

Lay wastewater pipe with suitable slope, ensure proper burial depth, and match pipe diameters to unit couplings.

Unit Construction Procedures

Carry out earthwork according to regulations, excavate pits, ensure proper levelling on a reinforced concrete base.

Blower and Air Supply Pipe Installation

Select a ventilated location for the blower, connect electric cable, ensure distance to unit does not exceed 5m.

AUGUST BASIC Controller Installation

Install controller indoors or in blower container, ensure good air circulation, and lay appropriate electric cables.

Warranty Terms and Conditions

Manufacturers Quality Warranty Period

The underground part of the unit housing has a 10-year quality warranty from the date of sale or transfer.

Manufacturers Rectification Obligation

Manufacturer will rectify defects attributable to them and perform start-up/tuning within a reasonable period.

Warranty Coverage Scope

Warranty covers defects in underground housing due to material quality or design shortcomings notified during the term.

Warranty Validity Conditions

Warranty is valid if unit is stored/transported correctly, operated per manual, installed by authorized personnel, and paid for.

Warranty Service Eligibility Requirements

Operator must notify seller of defect within 10 days and submit purchase and installation documents.

Unit Diagram and Technical Data

Technical Parameters Table

Table listing diameter, height, inlet/outlet pipe dimensions, and average electrical consumption for different unit models.

Treatment Process Overview

Mechanical and Electrical Devices

Components of the treatment process including solids bag, air distribution, blower, and airlifts.

Solids Bag Functionality

Describes the solids bag for separating gross solids from wastewater and handling non-degradable materials.

Air Distribution Panel and Valves

Explains the air distribution manifold with valves for adjusting air supply to airlifts and aeration elements.

Flow Controller, Blower, Diffuser, and Airlifts

Details operations of the flow controller, blower, diffuser, and airlifts, including specific valve settings.

AUGUST BASIC Controller Operation

Initial Setup and Navigation

Guide for first run, language selection, setting date/time, and menu navigation using buttons.

Program Selection and Modes

Explains standard and non-standard programs (Holiday, Weekend House) and how to change them.

Other Settings and Information

Details options like date/time setup, operating hours, log reading, service menu, language select, and device status.

GSM Module Functionality

Describes the GSM module for network sign-up, connection to service center, and automatic settings.

Operation and Maintenance Instructions

Launching and Unit Shutdown

Steps for launching the unit, connecting components, and proper procedures for unit shutdown and cleaning.

Routine Maintenance Tasks

Lists necessary periodic inspection and maintenance tasks for the unit, including frequency.

Important Control Points

Key operational checks for solids bag, airlifts, aeration, and sludge pumping.

Controller Error Messages and Alarms

Explains optical alarm types (constant/flashing green/red) and their meanings, including power failure.

Maintenance Schedule and Procedures

Inspection and Service Intervals

Details maintenance modes like sludge concentration check, sludge removal, and filter replacement with intervals.

Controller Maintenance Notifications

Explains warnings like 'REPLACE FILTER' and 'CHANGE MEMBRANE' and how to confirm them.

Removal of Excess Sludge

Procedure for measuring settled sludge content and removing excess sludge to maintain optimal treatment efficiency.

Unit Maintenance Manual Recording

Excess Sludge Removal Process

Step-by-step guide for removing excess sludge, including blower shutdown and water level management.

Maintenance Manual Documentation

Importance of recording all defects, maintenance, and service visits in the manual for claims.

Safety and Protective Measures

General Security Precautions

Guidelines for safe servicing, electrical work, tool usage, hygiene, and access restrictions.

Personal Protective Equipment

Mandatory personal and protective equipment to be used during maintenance and operation.

Recommended Tools for Maintenance

List of specific tools recommended for unit maintenance, such as test flasks and brushes.

Certificate of Performance

Performance Test Results

Details of test report by PIA GmbH showing efficiency results for COD, BOD5, SS, NH4-N, Ntot, and Ptot.

EC Declaration of Performance

Product Identification and Intended Use

Unique code for domestic wastewater treatment plants and their intended use for treating wastewater.

Manufacturer and Harmonised Standard

Information on the manufacturer, authorized representative, and the harmonised standard EN 12566-3.

Declared Performances and Characteristics

Table of declared performances including efficiency, capacity, watertightness, and material properties.

August AT-6 Specifications

General IconGeneral
BrandAugust
ModelAT-6
CategoryWater System
LanguageEnglish