WASTEWATER TREATMENT
13
Important points of control:
Solids bag
Operaon of airli 1
Aeraon work
Operaon of airli 2
-
Operaon of airli 3
• OPERATION AND MAINTENANCE INSTRUCTIONS
Launching the Unit:
Unit shutdown:
The list of necessary maintenance tasks:
Method of control maintenance Frequency of control maintenance
Check the Unit for foul odour periodically
periodically
surface
1 x month
regulator
1 x month
Check the solids bag 1 x month
DURING THE INSPECTION, THE OWNER SHOULD: