Do you have a question about the August AT-8 and is the answer not in the manual?
Steps for preparing the construction site and pipework for the unit.
Guide to setting up and operating the AUGUST BASIC controller.
Steps for launching the unit after installation.
Periodic inspection and maintenance tasks for the owner.
Explanation of optical and audible alarms and error indicators.
Details the recommended frequency and specific tasks for unit maintenance.
Outlines the method for measuring settled sludge using a sedimentation test flask.
Lists required personal protective equipment and recommended tools for maintenance.
Highlights safety measures for personnel working with household wastewater.
Steps for preparing the construction site and pipework for the unit.
Guide to setting up and operating the AUGUST BASIC controller.
Steps for launching the unit after installation.
Periodic inspection and maintenance tasks for the owner.
Explanation of optical and audible alarms and error indicators.
Details the recommended frequency and specific tasks for unit maintenance.
Outlines the method for measuring settled sludge using a sedimentation test flask.
Lists required personal protective equipment and recommended tools for maintenance.
Highlights safety measures for personnel working with household wastewater.
| Category | Water System |
|---|---|
| Valve Type | Solenoid |
| Material | Plastic |
| Battery Life | Up to 1 year |
| Weather Resistance | Yes |