WASTEWATER TREATMENT
3. Construcon:
-
3.5. IMPORTANT!
3.2. IMPORTANT! Pit depth depends on the depth of the
3.3. IMPORTANT!
reinforcement mesh) is concreted on the compacted soil, or prefabricated reinforced concrete soles
can be used.
IMPORTANT!
Principal diagram 2