Four post rack bolted to floor and braced if necessary
Four post rack must be grounded to the same grounding electrode used by the power
service in the area. The ground path must be permanent and must not exceed 1 Ohm of
resistance from the rack to the grounding electrode.
Verify that you have all the screws, brackets, and clamps to assemble and install the four post
rack mount kit.
Figure 10: Four post rack mount kit assembly
About this task
Perform the following procedure to assemble and install the four post rack mount bracket kit.
Procedure
1.
Attach a front bracket to each guide bracket with four M2 x 3mm long flat head
machine screws.
Switch installation
34 VSP 7000 installation July 2013