14
Now its time to unpack your AVL Electrolyte Ana-
lyzer. Carefully remove the unit from the box. DO
NOT lift the analyzer by the foam packaging materi-
als, which are provided for shipping only.
Before you begin installing your system, take a mo-
ment to look over the contents to ensure that you have
everything you need to get your analyzer up and
running.
Check for these items:
Power cord
Electrodes
Printer paper
ISE SnapPak
TM
Cleaning Solution A
Electrode Conditioning Solution
ISE-trol Electrolyte Control
You will also need a supply of lint-free tissues and
disposable sample cups, which should be kept in a
location convenient to the analyzer.
Setting up
Now youre ready to get your AVL Electrolyte
Analyzer prepared to operate. Prior to beginning the
actual installation, it is a good idea to completely read
through this chapter to develop an understanding of
the procedures that are required.