EasyManua.ls Logo

Avtron 2000 Series - User Manual

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
2000 Series Load Bank
User’s Guide
Part Number: Manual Toggle Switch
Revision Date: November 2022 V3
Question and Answer IconNeed help?

Do you have a question about the Avtron 2000 Series and is the answer not in the manual?

Summary

Safety Considerations

Product Description

Installation Guide

Pre-Installation and Placement

Initial checks and guidelines for Load Bank positioning and ventilation.

Power Requirements

Details on the required voltage, phase, and frequency for control circuit operation.

Load Connection Procedures

Methods for connecting power to the Load Bank via receptacles or bus bars.

Grounding and Blower Connections

Procedures for proper grounding and connecting the blower motor.

Operation Guide

Standard Operating Instructions

Step-by-step procedures for safely operating the Load Bank.

Single-Phase Operation Modes

Explanation of connection modes for single-phase power supply.

Maintenance Procedures

Daily Maintenance Checks

Routine checks for airflow, screens, and exhaust direction.

Periodic Maintenance and Parts

Scheduled inspections and guidance on replacing components.

Loadbank Warranty Information

General Warranty Overview

Covers the two-year limited warranty against defects in material and workmanship.

Warranty Exclusions and Claims

Details conditions not covered and the procedure for filing claims.

Summary

Safety Considerations

Product Description

Installation Guide

Pre-Installation and Placement

Initial checks and guidelines for Load Bank positioning and ventilation.

Power Requirements

Details on the required voltage, phase, and frequency for control circuit operation.

Load Connection Procedures

Methods for connecting power to the Load Bank via receptacles or bus bars.

Grounding and Blower Connections

Procedures for proper grounding and connecting the blower motor.

Operation Guide

Standard Operating Instructions

Step-by-step procedures for safely operating the Load Bank.

Single-Phase Operation Modes

Explanation of connection modes for single-phase power supply.

Maintenance Procedures

Daily Maintenance Checks

Routine checks for airflow, screens, and exhaust direction.

Periodic Maintenance and Parts

Scheduled inspections and guidance on replacing components.

Loadbank Warranty Information

General Warranty Overview

Covers the two-year limited warranty against defects in material and workmanship.

Warranty Exclusions and Claims

Details conditions not covered and the procedure for filing claims.

Avtron 2000 Series Specifications

General IconGeneral
BrandAvtron
Model2000 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals