xxv
Contents
Chapter 1:  Control System Structure  ����������������������������������������������������������������������������  1-1
1.1  System Configuration  .........................................................................................................  1-2
1.2  Travel Transmission Output (Models AVP301 and AVP201)  .......................................  1-3
1.2.1  Structure of system without travel transmission output  .............................................  1-3
1.2.2  Structure of system with travel transmission (analog output)  ...................................  1-4
1.2.3  Structure of system with travel transmission (digital output)  ....................................  1-4
1.3  Description of Device Structure and Functions  ..............................................................  1-5
1.4  Terminal Box  ........................................................................................................................ 1-7
Chapter 2:  Installation  �����������������������������������������������������������������������������������������������������  2-1
2.1  Installation Location Selection Criteria  ............................................................................  2-2
2.1.1  Installation location selection criteria  ...........................................................................  2-2
2.1.2  Instrumentation air  ..........................................................................................................  2-2
2.2  Installation Method  .............................................................................................................  2-4
2.2.1  Attachment to actuator  ....................................................................................................  2-4
2.2.2  Air piping connection  ......................................................................................................  2-7
2.2.3  Handling of double-acting reversing relay  ..................................................................  2-10
2.2.4  Electrical Wiring Connection  .......................................................................................  2-12
2.2.5  Power supply for input signal and travel transmission  .............................................. 2-15
2.2.6  Cables (for input signal or travel transmission)  ......................................................... 2-16
2.3  Remote Type Handling  .....................................................................................................  2-18
2.3.1  Remote type cable handling  .......................................................................................... 2-18
2.3.2  Attachment to the actuator of the valve travel detector  ............................................ 2-20
2.3.3  Positioner body installation  .......................................................................................... 2-21
2.3.4  Cabling between valve travel detector and positioner body  .....................................  2-21
2.4  Flameproof Cable Gland and Explosion-proof Universal Elbow  ................................ 2-22
Chapter 3:  Operation  �������������������������������������������������������������������������������������������������������  3-1
3.1  Auto-setup  ............................................................................................................................  3-2
3.1.1  Overview of auto-setup  ...................................................................................................  3-3
3.1.2  Auto-setup operation  .......................................................................................................  3-5
3.2  Zero/Span Adjustment  ........................................................................................................  3-6
3.2.1  Procedure to adjust valve to fully closed position (zero point)  ..................................  3-7
3.2.2  Procedure to adjust valve to fully open position (span point)  ...................................  3-7
3.3  Starting Operation  ...............................................................................................................  3-8
3.3.1  Pre-operation confirmation  ............................................................................................  3-8
3.3.2  Starting operation  ...........................................................................................................  3-10
3.3.3  Stopping operation  ......................................................................................................... 3-10