WWW.BALTIMOREAIRCOIL.COM
4
WWW.BALTIMOREAIRCOIL.COM
4
Figure 1. Series 3000 Cooling Tower
SERIES 3000 COOLING TOWER
Unit Operation and Storage
1
Start-Up Procedure
General
• Iftheunitismountedonvibrationisolatorsorisolationrails(byothers),refertothe
vibrationisolationmanufacturer’sguidelinesbeforeloading/unloadingweightfromthe
unit.
• Verifythefanandsystempumpmotorsaredisconnected,lockedout,andtaggedout.
BALTIDRIVE
®
PowerTrain
HotWater
BasinandCover
ColdWater
Basin
FanDeck
AirIntakeLouvers
FanGuard
TopWaterInlet
Casing
Make-upValve
AdjustableFloat
WaterOutlet
Connection
Suction
Strainer
BACross
®
Fillwith
IntegralDrift
Eliminators
DANGER: Do not perform any
service on or near the fans, motors,
and drives, or inside the unit
without first ensuring that the
fans and pumps are disconnected,
locked out, and tagged out.