RIGGING AND
INSTALLATION
1
RI_VL_SA 01/11-01
VTL Cooling Towers
VFL Closed Circuit Cooling Towers
VCL Evaporative Condensers
The BAC equipment should be rigged and installed as
outlined in this bulletin.
These procedures should be thoroughly reviewed prior to
the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all
necessary equipment will be available at the jobsite.
Be sure to have a copy of the unit certified drawing
available for reference. If you do not have a copy of this
drawing or if you need additional information about this
unit, contact the local BAC representative. The model
number and serial number of the unit are located on a
label on the sinde of the unit.
Table of Contents Page
General Information 2
Rigging 4
Optional Accessories Assembly 5
Inspection Prior to Start-up 7
Recommended Maintenance and
Monitoring Programme
8

Other manuals for BAC VTL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BAC VTL and is the answer not in the manual?

BAC VTL Specifications

General IconGeneral
BrandBAC
ModelVTL
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals