EasyManua.ls Logo

Bard W18A1 - Figure 3 C Mounting Instructions - W42, 48, 60, 70

Bard W18A1
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual 2100-508A
Page 10 of 25
FIGURE 3C
W42A1, W42L1, W48A1, W48L1, W60A1, W60L1, W70A1, W70L1
MOUNTING INSTRUCTIONS
D
16"
16"
16"
16"
16"
1
7
8
"
6
1
2
" 6
1
2
"
2
1
8
"
7
8
"
1"
3"
4"
Typ.
4"
Typ.
6
1
2
"
30"
E
16"
A CC
3
1
8
"
B
RAIN FLASHING
TOP
RETURN AIR
1
1
DUCT
REQUIRED DIMENSIONS TO MAINTAIN
1/4" MIN. CLEARANCE FROM
COMBUSTIBLE MATERIALS
REQUIRED DIMENSIONS TO MAINTAIN
RECOMMENDED 1" CLEARANCE FROM
COMBUSTIBLE MATERIALS
ABCDE
30 1/2
10 1/2
6 1/4 1 1/4 29 3/4
32 12 5 1/2
229
OPENING
Supply Opening
Dimension is 21" on W70A and W70L Units.
IT IS RECOMMENDED THAT A BEAD OF
SUPPLY AIR
NOTES:
TOP FLASHING AT TIME OF INSTALLATION.
Return Opening
SILICONE CAULKING BE PLACED BEHIND
THE SIDE MOUNTING FLANGES AND UNDER
MIS-416 C
TOP.
WALL
FOUR SIDES OF SUPPLY
AIR DUCT IS REQUIRED
WALL STRUCTURE
FROM COMBUSTABLE
1/4" CLEARANCE ON ALL
MATERIALS
HEATER ACCESS
PANEL
FOAM AIR SEAL
SUPPLIED
Right Side View
Wall Opening and Hole Location View
1
SEAL WITH BEAD
OF CAULKING ALONG
ENTIRE LENGTH OF
W**A UNIT SHOWN, W**L UNIT
CONTROLS AND HEATER ACCESS
IS ON OPPOSITE (LEFT) SIDE.

Table of Contents

Related product manuals