EasyManua.ls Logo

Barford SR124 - Scheduled Maintenance Tasks; 10-Hour Maintenance Schedule; Engine Maintenance Schedule; Conveyor Maintenance Schedule

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
25
MODEL SR124
Good records and maintenance are mandatory aspects of a machine's life. Good maintenance of your sceener is vital;
the screener will perform at its best when cared for.
Only personnel with proper qualifications for servicing and maintenance can perform these tasks.
All safety regulations and risk assessment should be followed before maintenance is carried out.
Never work under unsupported equipment. It is important to remember that any raised part of the machine can fall, causing
injury or death.
When maintenance is carried out ensure all safety aspects are in good working order before returning the machine to operating
service.
Any hydraulic maintenance should be carried out by qualified personnel.
Always bleed and depressurize the hydraulic lines before attempting maintenance or repairs.
Replace any worn or broken parts as soon as possible.
Keep power units dry at all times.
Power washing can weaken the seal on plugs.
All electricity should be isolated before removing the front panel.
9) MAINTENANCE CONTINUED