EasyManua.ls Logo

barkman oasis - Fireplace Base and Firebox Assembly; Laying Out Base and Firebox Layers

barkman oasis
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Section A - Fireplace Base & Firebox
1. On your prepared level base, lay out
the first layer as in the diagram.
8 x 12 (21)
4 x 8 (2)
IMPORTANT: Periodic checks must be
made to ensure that the layers remain
level. If layers are not level, use the
included shims to adjust as necessary.
2. Lay out the second layer directly on
top of the first.
8 x 12 (20)
4 x 8 (5)
3. Lay out the third layer directly on top
of the second.
8 x 12 (17)
4 x 8 (1)
8”x12”
4”x8”
8”x12”
4”x8”
8”x12”
4”x8”

Other manuals for barkman oasis