8
05-2021
9
A Lay out the tenth layer as shown in
the diagram.
B Check that stones are level. Use
included shims for adjustments.
USE:
(8) 12 x 8 Sierra Grey blocks
(2) 8 x 8 Sierra Grey blocks
(2) 4 x 8 Sierra Grey blocks
10
A Lay out the eleventh layer as shown
in the diagram.
B Glue the block indicated in the
diagram to the Quarry Stone below.
C Check that stones are level. Use
included shims for adjustments.
USE:
(8) 12 x 8 Sierra Grey blocks
(2) 8 x 8 Sierra Grey blocks
(2) 4 x 8 Sierra Grey blocks
8
A Place the mantle into the ninth layer
as indicated in the diagram.
B Glue the mantle where is contacts
the Quarry Stone below using the
included landscape adhesive.
USE:
Mantle
Glue block