EasyManua.ls Logo

Bauer RAINSTAR A3 - PTO Rewind

Bauer RAINSTAR A3
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual for BAUER RAINSTAR A3
19
5 QUICK STOP
Apply the reel brake. Now the PE-pipe retraction can be
stopped immediately by actuati ng the shut-off frame or the
gear shifting lever. Thereby the gearbox is disengaged.
Slacken the PE-pipe slowly by opening slightly the reel brake.
6 WINDING MECHANISM
The winding mechanism operates synchronously with the
winding or unwinding of the PE-pipe. Starting from the reel, it
is operated through a chain and the helically grooved spindle
that transports the winding carriage of the PE-pipe. The
winding mechanism ensures that the PE-pipe is guided
properly winding for winding. When you put the machine into
operation for the first time, pull off the full length of the PE-
pipe to let it take a circular shape under pressure and
eliminate ovality. This step is essential for trouble-free
operation of the winding mechanism.
7 SHUT-OFF AND SAFETY EQUIPMENT
Unattended operation of the RAINSTAR A3 is ensured by a
final- and safety shut-off device. The final shut-off device is
actuated when the sprinkler cart pushes against the shut-off
frame which in turn operates the gearbox shut-off lever
through a system of rods stoppi ng thus the drive. To avoid
troubles caused by faulty windi ngs of the PE-pipe on the reel,
the shut-off device also is ac tivated by the shut-off frame
when faulty pipe windings build up on the reel.

Other manuals for Bauer RAINSTAR A3

Related product manuals