Installation Guide
Carefully flip the adjustable base over on to its legs.
Important :
Two people are required to flip the
adjustable base. Do not drag across the floor; do not
rest frame on its side; excessive pressure may
damage legs.
Plug the power cord into a grounded electrical outlet.
A surge protector is strongly recommended.
(Not included)
The button cell battery is correctly installed in the
remote. User just needs to pull out insulating strip
and t hen r emote is w orking.
Quickly test functions to verify proper setup before
placing mattress on adjustable base. Press Head
and Foot down to return the adjustable base to a
flat position.
Install the (2) two corner Retainer Bars to the foot of
the adjustable base on the left and right hand sides.
Place your mattress on top of the adjustable base.
Adjustable base installation is now complete.
7
STEP 6
STEP 7
STEP 9
STEP 8
STEP 10
Always use two people when setting up the adjustable base, moving or flipping the adjustable base.
Flip Adjustable Base Retainer Bar Installation
Plug-in Adjustable Base
Test Remote
Installation Complete