HEADBOARD
DC Power Cord
Control Box
4
Install 4 legs; make sure the
legs are tight.
HEADBOARD
6
Flip the foot end of the bed from the box and lay it
on top of the end at the headboard.
HEADBOARD
7
Install the remaining 2 legs on the foot end of the
bed; make sure the legs are tight.
Uncoil the DC power cord (connected to the control
box) and put it to the side of the bed.
HEADBOARD
5
Remove the bed from the box
with a flipping
motion; let the
bed stand on the 4 legs.
- 4 -