EasyManua.ls Logo

Bego LaserStar T Plus - Page 25

Bego LaserStar T Plus
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
86076 DB-en/03 355.00032
English
LaserStar T Plus
en
Engineer level/Page 2
Fig. 15 Service menu - Engineer level / page 2
Change engineer password
The [ Start ] button opens the
ALPHANUMERIC
INPUT WINDOW to enter a new engineer
password.
Change date and time
The [ Change ] button opens a dialog to set date and
time.
PSU test
Basics
The PSU test ascertains the real maximum power
that can be achieved with
the current mains supply (230 V or 110 V),
the currently installed power supply unit (PSU)
and
the currently installed laser lamp.
This test has been performed at the factory with a
supply voltage of 230 V. The test must be performed
by the customer only if the system is operated at
110 V. (The version for 110 V is an optional system
configuration.)
The [ Set ] button opens the following window.
Fig. 16 PSU test
The [ Start ] button initiates a PSU test. The button
text changes to [ Working ] on inverted background
as long as the test is running.
When the test has been finished the power that can
be achieved is indicated underneath the button.
NOTE
It is important to set date and time correctly in
order to obtain a reliable history.
This is also important, inter alia for the mainte-
nance recommendations that are generated by
the system.

Related product manuals