EasyManua.ls Logo

Belling BC60S - Installation

Belling BC60S
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
4
Installation
The bending of ventilation tube should be 120°,parallel or above the
start point/should be connected to the external wall.
placed horizontally to avoid
After installation, make sure that plug can be
removed
if necessary.
ed 650~750 mm up from the
Fig.1
Right Wrong
There shall be adequate ventilation of the room when the cooker
hood is working.
grease collection at one end. See Fig.1.
cooking plane for safe and a good effect. See Fig.2.
T he cooker hood should be plac
Please make sure the installation plate is

Related product manuals