EasyManua.ls Logo

BEMIS Flow Grove - INSTALLATION GUIDE; Single Hole Installation Procedure; Three Hole Installation Procedure

Default Icon
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 10
INSTALLATION GUIDE
Deck Plate
Cold Water Line
Hot Water Line
Battery
Power Cord
Rubber Gasket
Metal Washer
Brass Nut
Screw
*For Three-Hole Install ONLY
1. Single Hole or Three Hole Installation
Single Hole - Securely attach the hoses to the faucet. Put the hoses and
data cable through the faucet mounting hole and fix the faucet on the sink.
Make sure to install the hot and cold water lines in accordance
with the markings.
Tighten with a Phillips screwdriver.
Three Hole - Securely attach the hoses to the faucet. Put the hoses
and data cable through the deck plate and faucet mounting hole.
Fix the faucet on the sink.
Make sure to install the hot and cold water lines in accordance
with the markings.
Tighten with a Phillips screwdriver.
2. Install Rubber Gasket
Slide the rubber gasket first and the metal washer second. Then install
the nut onto the screw. Tighten the nut using an adjustable wrench.
GETTING STARTED

Other manuals for BEMIS Flow Grove

Related product manuals