EasyManua.ls Logo

Bergey Powersync II User Manual

Bergey Powersync II
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Owner’s Manual
BWC EXCEL 10
Wind Turbine &
Powersync II
Grid-Intertie Inverter
Revision 2.0
April 2014
Part # MANXLS
Bergey Windpower Co.
2200 Industrial Blvd.
Norman, OK 73069 USA
TEL: 405-364-4212
FAX: 405-364-2078
E-mail: sales@bergey.com
Web Site:www.bergey.com
Question and Answer IconNeed help?

Do you have a question about the Bergey Powersync II and is the answer not in the manual?

Bergey Powersync II Specifications

General IconGeneral
BrandBergey
ModelPowersync II
CategoryWind Turbines
LanguageEnglish

Summary

II. EXCEL 10 SPECIFICATIONS

III. System Description

Powersync II Inverter

Explains the inverter's function in converting AC to utility-grade electricity.

IV. System Operation

Normal Operation

Explains how the turbine interacts with the utility grid.

High Winds - Autofurl

Details the automatic furling mechanism in high winds.

Manual Furling

Describes situations requiring manual furling and its purpose.

Furling Procedure

Provides step-by-step instructions for manual furling.

V. Powersync II Inverter

Inverter Specifications

Details input and output specifications for the inverter.

Important Inverter Safety Instructions

Provides critical safety guidelines for inverter installation and maintenance.

VI. Installation

Mounting

Details mounting procedures and requirements for the inverter enclosure.

Electrical Connections

Explains how to make electrical connections to the inverter.

AC Output Connection

Describes how to connect the AC output to the power distribution.

AC Input Connection (Turbine)

Explains how to connect the turbine's AC input to the inverter.

Earth Ground Connection

Details the procedure for making earth ground connections.

VII. Inverter Operation

Inverter Fault Codes

Lists and describes common inverter fault messages and their codes.

VIII. Turbine Installation

IX. Inspections and Maintenance

Check List for Inspections

Lists inspection points for the turbine and tower.

X. Trouble-Shooting Problems