Wall hung, fanflue, roomsealed, high efficiency gas boiler
User manual and
Installation instructions
Riva Plus HE ERP
Models G.C. Appl. No.
RIVA PLUS HE 24C ERP 47-583-41 COMBI BOILER
RIVA PLUS HE 28C ERP 47-583-42 COMBI BOILER

Table of Contents

Other manuals for Biasi RIVA PLUS HE 28C ERP

Question and Answer IconNeed help?

Do you have a question about the Biasi RIVA PLUS HE 28C ERP and is the answer not in the manual?

Summary

Instructions for Use

User Safety Warnings

Highlights critical safety and operational warnings for using the boiler.

Useful Advice for Boiler Operation

Periodic Maintenance Schedule

Recommends annual servicing for efficient and continuous operation.

Troubleshooting Operational Faults

Guides users on identifying and rectifying common boiler faults.

Technical Information

Technical Data: Riva Plus HE 24 C ERP

Lists detailed technical specifications for the 24C ERP model.

Technical Data: Riva Plus HE 28 C ERP

Lists detailed technical specifications for the 28C ERP model.

General Requirements for Installation

Flue System Installation

Covers requirements and guidelines for the flue system installation.

Electrical Supply and Safety

Covers essential electrical connection and safety requirements.

Installation Procedures

Installation Safety Warnings

Highlights crucial safety warnings related to boiler installation.

Installation Precautions

Lists essential precautions to be taken during boiler installation.

Flue System Fitting

Explains how to correctly install the flue system, including sloping and extensions.

Electrical Connections Guide

Provides detailed instructions for making electrical connections to the boiler.

Commissioning the Boiler

Commissioning Safety Warnings

Emphasizes that commissioning must be done by qualified personnel.

Electrical System Checks

Outlines preliminary electrical safety checks for commissioning.

Gas Supply Installation Checks

Details checks for gas supply tightness and purging.

Initial System Filling and Flushing

Describes the procedure for initially filling and flushing the central heating system.

Initial Boiler Lighting

Instructions for the initial lighting and operation of the boiler.

Gas Pressure Check at Burner

Details how to measure and verify gas pressures for optimal efficiency.

Burner Ignition Verification

Explains how to check the burner ignition sequence and uniformity.

Pump Operation and Release Check

Guides on verifying the pump's operation and release mechanism.

Gas Conversion

Gas Conversion Safety Warnings

Safety warnings specific to gas conversion procedures.

Gas Conversion Procedures

Step-by-step guide for converting the boiler to different gas types.

Maintenance Procedures

Maintenance Safety Warnings

Safety warnings for all maintenance procedures.

Combustion Analysis Check

Describes how to perform a combustion analysis for efficiency.

Benchmark Commissioning and Servicing

Biasi RIVA PLUS HE 28C ERP Specifications

General IconGeneral
Boiler TypeCombi
MountingWall-mounted
ERP RatingA
Output28 kW
DHW Output28 kW
Fuel TypeNatural Gas
Warranty2 years
Dimensions (H x W x D)700 x 400 mm

Related product manuals