value (please first clean up all the sundries in the new pipe before connecting to the
machine, in case that it would block the inflowing and influence the magnetic value
control.
5. The water boiler must have its dedicated power supply. Also the fuse and leakage
protector must be installed according to the product specification (the action current
of the leakage protector is 30mA).
6. This product belongs to Type “I” appliance, the yellow and green double color line
in the power line is the “ground lead”, and it should be connected sturdy to the
grounding device which is live up to electricity regulations of the state.
Warning: never connect the ground lead to water pipe and gas pipe.
. Operation instruction
1. First using the machine, please check if it is conform to the installation requirements.
Then open the water switch, and check if all the joint of the machine are fixed and
have no leakage.
2. Switch on the main power, and turn on the power switch behind the machine, then
press the “Switch” button on the display board, “ELL” display on the LED and the
dry burning protection automatically launch, the magnetic value start to inflow the
water. (to turn off the display board need to long press the “Switch” button for 5
seconds, by now the machine stop working but still on)
3. The yellow (heating) indicator light on, means the machine start heating: light off,
the heating stops. For the first time using, we suggest to open the faucets to have
one or two cycle pouring water to see if the inlet and outlet of water is working
normally.
4. When the yellow (heating) indicator light off, the green (drinkable) indicator light
on, it means that it have completed one rapid heating cycle. Before the chamber is
full, the yellow and green indicators would mutually light on, and the machine
would automatically process the “inflowing-heating” cycle. During the cycle, if the
green indicator light on and the LED display 100℃, it means the water have reached
the needed temperature and drinkable.
5. The steam would be gathered、cool down and outflow through the “Steam outlet”
which is set at the bottom of the machine. Please place in the wet pan which is
combined with the water boiler before using.
6. Machine data adjustment:
1) Long press the “Switch” button, to make the machine remain OFF, by now you
can set the data.
2) Machine remain OFF, long press the “Set” button for 3 seconds to display the
data, then use the “Plus” and “Minus” button to adjust the data, then press “Set”
button to switch or exit, and the data is automatically saved.