EasyManua.ls Logo

Blue Wave NB19909 - Leveling the Area

Blue Wave NB19909
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
WARNING!
Leveling is extremely important: take as much time as necessary to ensure the pool site is
completely rm and leveled.
WARNING: VERY IMPORTANT! SITE MUST BE LEVEL, STABLE, COMPACTED SOIL.
CAUTION: You can not use sand or non-compacted soil to provide a level surface for this pool; it
will only wash out.
WARNING: The pools contains thousand of gallons of water! Should the pool collapse due to
unleveled ground, it could cause signicant property damage and even result in injury or death.
Use a carpenter’s level and straight edge 10-ft long, 2-in x 4-in board to ensure that the site is
completely level. (See Diagram 4)
Remove the higher ground rather than lling the low laying ground (See Diagram 5).
ATTENTION: Always remove rocks, stones, sticks, grass roots, and other debris from within the
marked pool area.
Once the pool site is completely leveled, debris removed and ground smoothed, place a layer of
sifted dirt or masonry sand that completely covers the pool site (See Diagram 6).
NOTE: If you are using a Gorilla Pad™ or heavy duty tarpaulin (both sold separately) you will not
need the sifted dirt or masonry sand in this step.
LEVELING THE AREA
If you are NOT using a Gorilla Pad™,
spread a light layer of ne brick layer’s
sand or sifted dirt over the foundation
area. Level this layer carefully.
(Diagram 4)
(Diagram 5)
(Diagram 6)

Related product manuals